Not effective Corrigendum to Commission Implementing Regulation (EU) 2025/1328 of 30 June 2025 implementing Directive (EU) 2024/1275 of the European Parliament and of the Council by establishing common templates for the transfer of information from national energy performance of buildings databases to the EU Building Stock Observatory ( Official Journal of the European Union L, 2025/1328, 29 August 2025 )
Vyhláška č. 1328/2025
Important dates
Documents and links
Corrigendum to Commission Implementing Regulation (EU) 2025/1328 of 30 June 2025 implementing Directive (EU) 2024/1275 of the European Parliament and of the Council by establishing common templates for the transfer of information from national energy performance of buildings databases to the EU Building Stock Observatory
On page 29, Annex I, point 4, ‘BUILDING RENOVATION PASSPORTS’, Table 22 is replaced as follows:
‘Table 22
Number of building renovation passports issued in the reported year and relevant information
|
Indicator |
Unit |
Total (for all buildings) |
Existing buildings |
|||||||
|
Total residential |
Out of which: |
Total non-residential |
Out of which: |
|||||||
|
Single family houses |
Multi-family buildings |
Offices |
Educational buildings |
Hospitals |
Other non-residential |
|||||
|
ID |
|
M |
M |
Miav |
Miav |
M |
Miav |
Miav |
Miav |
Miav |
|
Number of renovation passports issued in the year |
[no.] |
|
|
|
|
|
|
|
|
|
|
ID |
|
V |
V |
V |
V |
V |
V |
V |
V |
V |
|
Average current energy performance of buildings |
[kWh/(m2.yr)] |
|
|
|
|
|
|
|
|
|
|
Average estimated energy performance class (25) of buildings, after completion of all steps |
[kWh/(m2.yr)] |
|
|
|
|
|
|
|
|
|
|
Total estimated energy savings in primary energy consumption after the completion of all steps |
[MWh/yr] |
|
|
|
|
|
|
|
|
|
|
Total estimated energy savings in final energy consumption after the completion of all steps |
[MWh/yr] |
|
|
|
|
|
|
|
|
|
|
ID |
|
V |
V |
V |
V |
V |
V |
V |
V |
V |
|
Average estimated energy savings in primary energy consumption after the completion of all steps |
[%] (26) |
|
|
|
|
|
|
|
|
|
|
Average estimated energy savings in final energy consumption after the completion of all steps |
[%] (27) |
|
|
|
|
|
|
|
|
|
|
Total estimated operational GHG emission reduction after the completion of all steps |
[tCO2eq/yr] |
|
|
|
|
|
|
|
|
|
|
Average estimated operational GHG emission reduction after the completion of all steps |
[kgCO2eq/yr] |
|
|
|
|
|
|
|
|
|
|
Average estimated savings on energy bills after completion of all steps |
[EUR/building or building unit/yr] |
|
|
|
|
|
|
|
|
|
|
Average estimated investment to complete all steps |
[thou. EUR/m2] |
|
|
|
|
|
|
|
|
|
Poznámky
(25) This value should be drawn from the average estimated energy performance from which the energy performance class was estimated for each building.
(26) Percentage improvement compared to the energy consumption before undertaking the renovation.
(27) Percentage improvement compared to the energy consumption before undertaking the renovation.’