Effective COMMISSION IMPLEMENTING DECISION (EU) 2023/2699 of 27 November 2023 on the TEN-T cross-border railway connections between Brussels and Luxembourg on the North–Sea Mediterranean Core Network Corridor (part of the EuroCap-Rail project) (notified under document C(2023)7384) (only the Dutch and French texts are authentic)
Rozhodnutie č. 2699/2023
Important dates
Documents and links
COMMISSION IMPLEMENTING DECISION (EU) 2023/2699
of 27 November 2023
on the TEN-T cross-border railway connections between Brussels and Luxembourg on the North–Sea Mediterranean Core Network Corridor (part of the EuroCap-Rail project)
(notified under document C(2023)7384)
(only the Dutch and French texts are authentic)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1315/2013 of the European Parliament and of the Council of 11 December 2013 on Union guidelines for the development of the trans-European transport network and repealing Decision No 661/2010/EU (1), and in particular Article 47(2) thereof,
Whereas:
|
(1) |
As acknowledged by the consecutive Work Plans for the North Sea–Mediterranean Core Network Corridor, the cross–border railway project EuroCap–Rail is the railway link that aims to modernise the Brussels–Luxembourg link, going further to Strasbourg, achieving a high-performance line connecting the three European institutional capitals. When completed, it will improve local, short-distance cross–border, national, and international traffic flows from Benelux to Switzerland and Italy. |
|
(2) |
Decarbonising transport is a key policy objective of the Union. The Commission Communication ‘The European Green Deal’ (2) of 11 December 2019 has confirmed and strengthened the Union’s ambitions towards fighting climate change. |
|
(3) |
In this context, fostering railway transport to move goods and passengers, as outlined by the Sustainable and Smart Mobility Strategy (3), is an important Union transport policy and a long-standing priority for the implementation of the TEN-T network. |
|
(4) |
Through the completion of the cross–border railway project EuroCap–Rail, the North Sea–Mediterranean Core Network Corridor will be equipped and modernised with modern, safe and energy efficient railway transport infrastructure contributing to the achievement of the above objectives. |
|
(5) |
The EuroCap–Rail project is pre-identified on the North Sea–Mediterranean Core Network Corridor in Part III of the Annex to Regulation (EU) 2021/1153 of the European Parliament and of the Council (4). |
|
(6) |
The EuroCap–Rail project is an important cross-border railway project involving Belgium and Luxembourg, benefitting France as well as other Member States, which rely on a modern rail connection from the Benelux to Switzerland and Italy. |
|
(7) |
This project implies the creation of new infrastructure and the improvement of existing infrastructure. In order to support the coordinated and timely implementation of the project, it is necessary to adopt provisions laying down a description of the necessary actions and the timetable for their implementation. |
|
(8) |
This will help achieving the cross-border objectives of the Work Plan for the North Sea–Mediterranean Core Network Corridor. |
|
(9) |
Belgium and Luxembourg have already carried out significant works, including studies and infrastructure works, for the realisation of the EuroCap–Rail project. |
|
(10) |
For these reasons, it is important to identify the remaining actions necessary for the full completion of the project, so that European and national resources can be optimised, in line with respective planning and applicable co-financing rates, together with the available financial resources at national and regional level. |
|
(11) |
In order to monitor progress of the project’s implementation, the Member States concerned should provide the Commission with regular reports on the matter, concerning the sections situated in their respective territories, and notify any delays encountered. |
|
(12) |
The implementation timetable set out by this Decision should be without prejudice to the fulfilment of the requirements defined in the international and Union law, including provisions to protect the environment and human health. This timetable should allow to plan and fully optimise the availability of funding, without prejudging the financial commitment of a Member State or of the Union. It should, under no circumstances, compromise the Union’s and Member State’s standards for environmental protection and public participation. |
|
(13) |
Member States concerned should comply with Union environmental legislation, in particular Council Directive 92/43/EEC (5) and Directive 2011/92/EU of the European Parliament and of the Council (6). Mitigation measures should be applied to sections that fall into Natura 2000 sites and conditions are set to allow works to be carried out during the most appropriate periods. |
|
(14) |
Without prejudice to Article 47(2) second subparagraph of Regulation (EU) No 1315/2013, it is appropriate to foresee a review clause in this Decision. |
|
(15) |
Belgium and Luxembourg have approved the measures provided for in this Decision. |
|
(16) |
The measures provided for in this Decision are in accordance with the opinion of the Committee referred to in Article 52 of Regulation (EU) No 1315/2013. |
HAS ADOPTED THIS DECISION:
Article 1
Subject matter
This Decision lays down a description of the actions and the implementation timetable for the cross-border railway project EuroCap-Rail between Brussels and Luxembourg.
Article 2
Actions and timetable
Belgium and Luxembourg shall ensure the timely implementation of the following actions:
|
|
On line 161 (Brussels – Namur)
|
|
|
On line 162 (Namur – Luxembourg border)
|
|
|
On line n°8, Luxembourg
|
Article 3
Reporting
Belgium and Luxembourg shall report at least once a year to the Commission and to the European Coordinator for the North Sea–Mediterranean Core Network Corridor on the progress in implementing the actions referred to in Article 2 and shall notify any delay encountered, specifying the causes for the delay and indicating the corrective measures taken. For this purpose, those Member States may use, when appropriate, the content of the Annual Status Reports to be submitted under the Connecting Europe Facility Grant Agreements.
Article 4
Review
By 31 December 2025 at the latest, the Commission shall, following a request from Belgium and Luxembourg, or at its own initiative, carry out a review of the actions and of the timetable referred to in Article 2, with the assistance of the European Coordinator for the North Sea–Mediterranean Core Network Corridor.
Article 5
This Decision is addressed to the Kingdom of Belgium and the Grand Duchy of Luxembourg.
Done at Brussels, 27 November 2023.
For the Commission
Adina VĂLEAN
Member of the Commission
Poznámky
(2) Communication from the Commission to the European Parliament, the European Council, the Council, the European Economic and Social Committee and the Committee of the Regions ‘The European Green Deal’, COM(2019)640 final.
(3) Communication from the Commission to the European Parliament, the European Council, the Council, the European Economic and Social Committee and the Committee of the Regions, ‘Sustainable and Smart Mobility Strategy – putting European transport on track for the future’, COM (2020) 789 final.
(4) Regulation (EU) 2021/1153 of the European Parliament and of the Council of 7 July 2021 establishing the Connecting Europe Facility and repealing Regulations (EU) No 1316/2013 and (EU) No 283/2014 (OJ L 249, 14.7.2021, p. 38).
(5) Council Directive 92/43/EEC of 21 May 1992 on the conservation of natural habitats and of wild fauna and flora (OJ L 206, 22.7.1992, p. 7).
(6) Directive 2011/92/EU of the European Parliament and of the Council of 13 December 2011 on the assessment of the effects of certain public and private projects on the environment (OJ L 26, 28.1.2012, p. 1).